Home or Last Project Picture

Feb 02, 2021     Wiring, firewall forward - (3.3 hours)       Category: Electrical
1. Located and installed both shunts on firewall.
2. Installed Adel clamps on firewall to hold shunt harnesses.
3. Fabricated and installed the 6 AWG wire that goes from the main ANL current limiter to the Main shunt.
4. Fabricated one end of the 6 AWG wire that will run from the Main shunt to the Main alternator.
5. Ran both sets of shunt harnesses through the firewall and the avionics hell-hole.
6. Installed the connector and harness near the instrument panel that will connect to the volt-ammeter.


 